Our Methodology
Sounds familiar?
You know your business, we know software architecture.
Most of these problems start in the design, not the code. Together we build software that fits the business and keeps delivering value.
Let's team upThe mindset we bring
Engineering
An engineered process, not improvisation
An engineer's mindset and a disciplined process: design, review, build, test, repeat. Predictable and repeatable, with quality built in at every step.
Simplicity
The simplest solution that works
We cut complexity back to the essence, and make it visual so the whole team and the business actually understand it.
Future-proof (AI)
Ready for what comes next
Whether you give your specs, architecture and design to a development team or to an AI, the more context you provide, the better the output.
Engineering methodology
A set of processes and building blocks we apply wherever we can. As a whole or in combinations. A few examples:
Business Analysis
Understand the domain
We map the business processes and definitions in international UML standards. Just enough documentation to capture what the organisation really needs, no more.
Charter & Roadmap
Project and priorities
What's in the project, and what isn't. We map the scope, the related projects and features, and the order to build them in, as one simple visual overview.
System Design
IDesignWhat are we building?
Based on Juval Löwy's IDesign, we decompose the system into small components by volatility, not functionality. From your core business (use cases) to a clear, layered architecture that stays resilient to change.
Project Design
IDesignHow will we build it?
There are many roads to Rome, cheapest, fastest, in parallel, or via an MVP. We turn the architecture into a realistic plan, duration, cost and critical path, and validate it can actually be executed before you commit.
Detailed Design
Down to the contracts
Interfaces, class hierarchies and data contracts per component, all in one documentation landscape. Traceable from business process and requirement down to the smallest component, so functional and technical people alike see where something comes from and why.
Execution
Build it right
A software factory: build each component through the same predictable lifecycle of design, construction, review and test.
A complete method
Together, the blocks form one coherent, proven method for designing and delivering software.
Or exactly the part you need
Every block stands on its own. We bring in exactly the piece that fits your situation.
Have you Met Maät?
Our name is Dutch, and roughly translated it means acting with measure: the right balance between too much and too little. The name also nods to ancient Egypt, where Maät stood for order. That's exactly how we look at software development: enough structure to stay in control, enough speed to deliver value at minimum cost.
Why choose us?
We always implement the right balance between necessary and desirable investments with a focus on efficiency, quality, and future-proofing.
We structure, innovate, and increase quality and productivity in your software development and give direction to teams.
Everything based on your requirements and our practical experience.